Personal story / Moscow Region / 2023–2026
Uglovoy
Kvartal.
Three adjoining plots in Klin made it possible to build in phases. The barn-style and modular homes show how construction choices tie in with the guest experience and day-to-day operations.

Why I chose three adjoining plots
In summer 2023 I reviewed plots offered at land auctions in the Moscow Region. I compared locations on maps first and visited the sites after bidding. Three adjoining plots in Klin let me concentrate the work in one place and open the homes in phases.
I was still selling land near Krasnodar. As proceeds came in, I put part of them into construction. The renovations on Sobornaya and Mira had taught me to evaluate a future home as the person who would be responsible for it after the keys were handed over.
After selling an urban property, I looked for another opportunity where my decisions could add value. That was the appeal of rural land. The result depended on choosing the plot, building the house, connecting utilities and how comfortable the finished home would be to live in.

My role
From land selection to the first guest
I chose the plots and house formats, signed contracts and scheduled payments. On site I coordinated the contractors’ work with water and drainage installation. After construction I handled the fit-out and organised rentals.
First contract in August, two more in autumn
Before starting, I compared country-rental formats. I created a table covering home size, use of the grounds and guest services. I started with a small house. In late August 2023 I signed with Tekhnologiya, and by December the home was registered.
I signed contracts for the next two homes in September and October. Construction continued in 2024. My records indicate that both were registered in the spring. Registration was one step; utilities, furniture and the grounds still had to be ready for the first check-in.


Water, access and responsibilities
While builders put up the homes, I organised water supply and drainage. I worked with local officials and specialist organisations on roads, electricity, gas and connectivity. For each task I had to clarify who was responsible for that stretch of infrastructure and when the next work could begin.
In 2024 the plots went from leased to owned. As I recall, I signed the first purchase contract in January and the other two in May.





The houses begin welcoming guests
After construction I handled furnishing, landscaping and maintenance. We added outdoor soaking tubs. Guests need a kitchen and dining area indoors, and easy access and a place to relax outside. All became part of day-to-day operations.
In 2025 I focused on rentals and upkeep. In my experience, rates and occupancy were higher here than at my earlier projects in southern Russia.
The tall gable created room for an upper level in the barn-style home. The kitchen and living area share an open space downstairs. In the modular home, the covered terrace extends everyday living outside. On the same grounds, the two homes offer different ways to spend a few days away.


What changed after the first season
With construction finished, guest operations continued. My records show work began on three bathhouses in Klin in 2026.
For subsequent plots I recalculated the cost of entry. I also toured container-home production to examine structures and service layouts. It remained a feasibility study for a potential pilot.
