Personal story / Krasnodar area / 2021–2023

Outside
Krasnodar.

Moving from investment in completed properties to land, infrastructure and finding the next offer. A story by Stanislav Batychko.

Green land near Krasnodar under a summer sky
Land project · personal archive
By: Stanislav BatychkoFocus: land and infrastructure
BackgroundPyatigorsk

From subletting to a joint project

I started out subletting and renovating in Pyatigorsk. The apartment on Sobornaya Street was already welcoming guests when I began looking for ways to expand. It taught me to evaluate layouts and finishes with the work of maintaining an apartment in mind.

In July 2020 my partner and I discussed units at 4 Mira Street. We bought and rented out some units while negotiating with other owners. Once the second floor was consolidated, we revisited the apartment concept. By summer 2022 we were discussing a sale.

Architecture and the deal at 4 Mira Street
Sobornaya Street, Pyatigorsk. Temporary flooring in the corridor.
Sobornaya Street, Pyatigorsk. Temporary flooring in the corridor.
Sobornaya Street, Pyatigorsk. Corridor lighting brings out the brickwork texture.
Sobornaya Street, Pyatigorsk. Corridor lighting brings out the brickwork texture.
01A change of focus

I bought the first plots while work on Mira Street was still underway

In 2021 I began acquiring land around Krasnodar. Deals went through in stages: some involved swaps, others adjusting plot boundaries. I estimate the site ultimately covered around three-quarters of a hectare.

Proximity to the city mattered, but the land had to be checked in person. I organised boundary staking, groundworks and cadastral procedures. Setting out the boundaries showed which parts of the area could work together.

Working archive photo of the site with marked lines, part of preparing the concept for the land.
Working archive photo of the site with marked lines, part of preparing the concept for the land.
02Working on infrastructure

What the site needed before construction

On one plot I placed a site cabin and organised the drilling of a well. As I recall, the well was about 50 metres deep. Having water made the next steps easier to plan.

I worked on access, electricity, gas and internet at the same time, speaking with officials and specialist organisations. When arranging a boundary change I learned about leasing public land, which could cut the next project’s upfront land costs.

Site surroundings: water, shoreline and a power line. All had to be accounted for.
Site surroundings: water, shoreline and a power line. All had to be accounted for.
Light gravel road and a row of poles along the shore
October 2023. A gravel strip and utility poles are visible on the approach. The water provides a reference for comparison with summer photos.

Autumn 2023

The final land sales coincided with the start of construction in Klin

I was already taking part in land auctions in the Moscow Region that summer, and I signed the contract for the first home in late August. I recall selling the last plots near Krasnodar in autumn. As capital became available, I put it into construction in stages.