After renovating Tri Narzana, I wanted to work with an older residential building in Krasnodar too. The apartment, about 50–60 m², had to fit a living room and two separate bedrooms.

Why an older building?

For many years I worked with new developments, studying layouts and how districts grew around them. In the city centre, other things matter: an established street, quiet and the character of the building itself. Pyatigorsk taught me to notice these things before thinking about finishes.

In autumn 2020 we discussed handing over the keys. Most work took place in 2021. The designer and I replaced the original two-room layout with a shared living room and two compact bedrooms. We had to re-coordinate furniture placement with the bathroom and kitchen configuration.

Removing the old finishes
Removing the old finishes · June 2021

Before the crew arrived

The new kitchen location had to account for gas equipment. I organised the documentation and liaison with specialist services and even planned waste removal before demolition started. As I recall, we agreed the layout and equipment changes with the relevant specialists.

Six months on site

In June we stripped out the old finish and formed new partitions. Screeding, wiring and rerouting building services followed. We laid the flooring and tiled the bathroom in autumn. A December photo shows the state of the corridor finishes.

I coordinated the designer and crew, arranged procurement and took part in the work myself. As I recall, the main cycle took about six months. Surviving photos show the sequence up to the final finishes.

Laying the flooring
Laying the flooring · September 2021
Tiling
Tiling · October 2021
Building services
Building services · November 2021
Final finishes
Final finishes · December 2021

What the renovation lead is responsible for

In a small space, one misplaced partition or utility outlet has knock-on effects on several decisions. My job was to align the layout, technical constraints, procurement and work sequence ahead of time. An owner who needs a specific stage coordinated can bring in external management for just this part of the renovation.