I bought five rolls of wallpaper for a minor refurbishment. Behind the old finishes we found damp, crumbling plaster and problems with the roof. The wallpaper had to wait. What should we do with the entire wing?

From supplying goods to running my own property

While I was supplying home appliances, we tried renting out a flat in Pyatigorsk. The first guests found us through Booking.com. In trade, capital came back after each delivery. Here I could invest in a space that would remain mine after renovation and generate income from future stays.

In 2017 I put part of the proceeds from selling a Krasnodar apartment and part of my working capital into the project. Around the same time I began investing in Bitcoin. These were two parallel decisions about where to hold and how to use capital.

Damaged finishes and structural decking in a 2017 post
11 October 2017. Extract from an archived Instagram post, not the original image file.

Three apartments or five studios

We considered two layouts. Three spacious apartments had advantages, but for short stays guests seemed to value self-contained units and a choice of available dates. I chose five studios with a shared corridor. As I recall, the two original apartments totalled about 150 m² after expansion.

We did not open the entire property on a single day. Demolition and finishing continued in one part while guests stayed in another. Materials deliveries, noisy work and cleaning had to be scheduled as carefully as the building work itself.

Laser layout marking during the works.
12 September 2018. Laser layout marking during the works.
Work in a narrow corridor with exposed brickwork.
22 September 2018. Work in a narrow corridor with exposed brickwork.

Making drawings work with old brickwork

Removing plaster exposed lower courses of stone, traces of earlier alterations and an old stove. We found door handles and furniture details. We left intact brick exposed; where the substrate was crumbling, we needed a different finish.

I worked on site and coordinated designers and builders. At the busiest point, I recall a team of around five. In autumn 2018 we worked out how the wall paint would meet the ceiling and carried the vertical plywood joints onto the ceiling. For the mixer tap, we calculated the finished wall thickness in advance. In January 2019 we checked a niche against the tile layout, adhesive and cuts.

Masonry and a window opening during renovation.
1 October 2018. Masonry and a window opening during renovation.
Heating and exposed brick.
24 November 2018. Heating and exposed brick.

Fitting out the first room

Before I moved to Pyatigorsk, one of the largest items in the first room already had a history. While preparing a flat for sale in Stavropol I removed an Appollo whirlpool bath that I recall buying for about ₽55,000. It went into my warehouse in Krasnodar before finding a new home in the first room at Tri Narzana.

Filled whirlpool bath in operation, with spout and control panel
August 2019. The working whirlpool bath in the Sobornaya Street archive. The model label is not legible in the photograph.

I considered second-hand items and discounted furniture. Selecting a bunk bed for the fifth room raised practical questions about mattress sizes, linen and spare sets. I had to evaluate each purchase from the point of view of whoever would prepare the room for the next guest.

Linear lighting along the brick wall.
22 November 2019. Linear lighting along the brick wall.
Timber flooring elements during the works.
24 November 2019. Timber flooring elements during the works.

Check-ins, pricing and building services

By autumn 2018 we were comparing seasonal discounts, prepayment terms and revenue net of platform commissions. In March 2019 we worked on synchronising Airbnb and Booking.com calendars. In May we prepared a listing announcing the opening of the apartment with a balcony. That summer we were ordering building materials and cleaning occupied stock at the same time.

A guest complained about construction dust in autumn 2019, showing the cost of poor scheduling. Downtime was even more expensive. In 2020 we had to restore heating and address drainage problems promptly. When choosing a boiler, spare-part availability mattered more to me than a discount.

Finished bathroom interior.
15 December 2020. Finished bathroom interior.
Brickwork, lighting and a fitted kitchen area.
8 February 2021. Brickwork, lighting and a fitted kitchen area.
Living area with a brick wall.
20 February 2022. Living area with a brick wall.
Terrace.
20 February 2022. Terrace.
Archive view of the building in winter.
25 December 2020. Archive view of the building in winter.

Formalising the new layout

In autumn 2022 my lawyer and I cross-checked the documents and room configuration: five apartments and a shared corridor. In January 2023 I found the alteration plan, the order and the decision, and handed them over for follow-up. In April I told the lawyer that the apartments had been entered in the cadastre. The next step was to obtain extracts.

Three paths after launch

The property continued to welcome guests. I managed pricing, bookings, occupancy, cleaning quality and equipment condition.

At the same time we tried expanding the service itself. We took on extra apartments to sublet or manage, arranged transfers, excursions and cleaning, and reached agreements with horse-riding and flight organisers. This grew into a separate line of business with its own economics and time demands.

The third path was to acquire and transform another property with a partner. That continued at Kuznetsov House. In discussing the next purchase I already knew how hidden defects, approvals and future operations could change the original numbers.